Hybrid energy complex: 917.6 MW of wind power generation, 508.5 MW of photovoltaic power and 1,024 MW of hydroelectric power Romania
Sale Process Details
Transaction Type: Equity Partnership / Direct Acquisition
Status: Open for investor participation
Process Stage: ATR obtained, project ready for investment structuring and pre‑construction phase
Next Milestones:
- Completion of technical documentation and permits (2026–2027)
- Construction start (2027)
- Progressive commissioning (2029–2031)
Investment Options:
- Equity Partner: Co‑development and financing from Ready‑to‑Build to COD
- Direct Acquisition: Purchase of the asset through a binding offer, subject to satisfactory due diligence
Contact: PVLAND Investment Desk – info@pvland.eu
General Information
Technology: Wind, Solar PV, Hydro Pumped Storage
Total Installed Capacity: 2,450.1 MW
Wind Capacity: 917.6 MW
Solar PV Capacity: 508.5 MWp
Hydro Pumped Storage Capacity: 1,024 MW
Location: Romania
Other Details: The project has obtained the Technical Connection Approval (ATR), confirming grid connection feasibility. Construction works are expected to start in 2027, with progressive commissioning between 2029 and 2031. The hybrid configuration ensures continuous renewable generation supported by large‑scale storage and grid balancing capabilities.
Solar PV Details & Design
Technology: Utility‑scale Solar Photovoltaic
Installed Capacity: 508.5 MWp
PV Modules: TR78M – 575 W Mono‑facial
Number of Modules: 1,176,470 units
Inverters: Siemens SINACON PV – Central Inverters
Number of Inverters: 113
DC/AC Ratio: Optimized for high‑efficiency conversion and stable grid interaction
Layout: Fixed‑tilt configuration designed for maximum annual yield
Expected Annual Generation:
> 1,050 GWh/year (PV contribution within hybrid system)
Eolian Details & Design
Technology: Wind Power
Installed Capacity: 917.6 MW
Turbine Model: Vestas V162‑6.2 MW
Units: 148
Wind Resource: 8.7 m/s average wind speed; 992 W/m² mean power density
Design Highlights:
- High‑efficiency turbines optimized for variable wind conditions
- Advanced control systems for maximum yield
- Fully integrated with hybrid operation and grid support
Grid Compliance:
- Meets ATR requirements including FRT, reactive power control, AGC and PMU integration.
Hydroelectric Details & Design
Technology: Pumped‑Storage Hydropower
Installed Capacity: 1,024 MW
Configuration: Two‑reservoir pumped‑storage system
Turbines: Reversible Francis units
Cycle Efficiency: ~80%
Design Highlights:
- Large‑scale storage enabling continuous renewable dispatch
- Fast response for grid balancing and peak‑shaving
- Integrated with wind and solar generation to reduce curtailment
- Provides frequency regulation and system stability
Grid Compliance:
- Fully aligned with ATR requirements, including integration with SCADA, AGC and PMU systems.
Permitting
Status: Advanced permitting stage
Land Area: 1,080.64 hectares (concession granted)
Technical Studies Completed: Geological, topographical, geophysical, hydrological, pedological and agro‑chemical
Urban Planning: Urbanistic certificate obtained
Environmental Permitting: Full documentation submitted; final environmental permit under evaluation
Sectoral Approvals: Preliminary permits issued for environment, infrastructure, heritage, telecommunications, water resources, civil protection and agricultural land use
Grid Connection Study: Completed and approved (ATR)
Next Steps:
Final environmental permit issuance and completion of detailed engineering documentation
Connection Infrastructure
Grid Approval: Technical Connection Approval (ATR) obtained
Voltage Level: 400 kV
Main Substation: New 400 kV station with double busbar configuration
Transmission Lines: Two 400 kV double‑circuit lines (~33 km each)
Communication Systems: Fiber‑optic and PLC teleprotection
Grid Integration:
- SCADA/EMS full integration
- AGC (Automatic Generation Control)
- PMU (Phasor Measurement Units)
Evacuation Capacity: 2,181.6 MW approved
Compliance: Fully aligned with NTI and national transmission operator requirements
Land Rights
Land Area: 1,080.64 hectares
Land Status: Concession granted
Legal Framework: Fully compliant with national land‑use and territorial planning regulations
Documentation:
- Urbanistic certificate obtained
- Land‑use approvals from relevant authorities
- All required topographic, geologic and geophysical studies completed
Access & Easements: Rights of way secured for internal roads, transmission corridors and infrastructure
Next Steps:
Finalization of construction easements and detailed engineering layouts
Capex & Opex
Total CAPEX: €2.745 billion (three‑phase execution)
Phase 1 (2027–2029): €1.140 billion
Phase 2 (2028–2030): €1.020 billion
Phase 3 (2029–2031): €585 million
OPEX: Optimized hybrid operational costs supported by 24/7 technical service, centralized monitoring, and integrated maintenance across wind, solar and pumped‑storage systems.
Financial Notes:
- ATR tariff and grid connection costs included
- Pumped‑storage system reduces curtailment and increases revenue stability
- Hybrid configuration improves long‑term yield and lowers volatility
Other Information
Hybrid Operation:
The combined wind, solar and pumped‑storage configuration ensures continuous renewable generation, reduced curtailment and enhanced grid stability.
System Flexibility:
The pumped‑storage plant provides fast‑response balancing, peak‑shaving and long‑duration storage, enabling reliable dispatch even under variable weather conditions.
Environmental Impact:
The project is expected to reduce CO₂ emissions by at least 640,000 tons per year once fully operational.
Operational Management:
24/7 monitoring and technical support through a centralized control center, integrating all generation technologies and grid‑support systems.
Regulatory Alignment:
Fully compliant with EU climate and energy frameworks, including Fit for 55, renewable integration standards and storage infrastructure regulations.