Hybrid (PV + BESS) Opportunities
Discover verified land and project opportunities suitable for Hybrid Solar PV + BESS developments. PVLAND lists only assets that meet strict criteria for co‑location feasibility, technical performance, solar irradiation, grid‑connection potential and strategic positioning.
Explore greenfield hybrid projects, development‑stage assets and land plots suitable for combined photovoltaic generation and battery energy storage. Each opportunity includes essential information regarding land area, resource potential, proximity to transmission infrastructure, hybrid system advantages and development status.
Registered investors can request access to receive the full teaser, relevant technical documentation and direct contact with landowners or project developers.
PV 240 Mw + BESS 860 Mw - Rumania - code VUS01
Request Access to Project >>Solar PV 240 MWp with an estimated annual production of 295,624,248.48 kWh
Total BESS capacity (MWh) is 860 MWh
The company has the lease rights for 35 years with the possibility of extending the contract
PV 102,8 Mw + BESS 186 Mw - Rumania - code RTEB
Request Access to the Land >>102.4 Mw PV Solar Project and 186 Mw BESS with all licenses in RTB (Ready to Build) phase, in Romania.
PV 300 Mw + BESS 153,7 Mw - Rumania - code CSEP
Request Access to the Land >>A 300 MWp solar PV plant with a 153.7 MW battery energy storage system (BESS) optimizes grid stability and asset profitability. With ATR approval, it is ideally positioned for immediate implementation, having obtained all key permits and a defined high-voltage (400 kV) connection infrastructure.
PV 240 Mw + BESS 100,8 Mw - Rumania - code CSES
Request Access to the Land >>240 MWp solar PV plant features a 100.8 MW battery energy storage system (BESS). With exceptional solar irradiance of 1,692.21 kWh/m², this asset stands out for its high energy efficiency. The project has obtained an ATR (Authorization to Transfer) guaranteeing a stable connection to the high-voltage grid (400 kV).
PV 250 Mw + BESS 122,5 Mw - Rumania - code CSEH
Request Access to the Land >>Sola PV 250 MWp with a 122.5 MWh battery energy storage system (BESS). This combination allows for optimized energy management and greater profitability through participation in grid services and arbitrage. The project has received a Technical Connection Approval (ATR).
PV 165 Mw + BESS 81,7 Mw - Rumania - code CSEH
Request Access to the Land >>165 MWp solar PV plant with an 81.7 MWh battery energy storage system (BESS). With excellent annual solar irradiance of 1,677.79 kWh/m², the plant guarantees optimal performance and an estimated annual production of over 216 GWh. The project includes an ATR (Automatic Transfer Switch) and a planned connection to the 400 kV high-voltage grid.
